|
Beijing Gas & Aero Power, Ltd has successfully completed projects in technical modification and upgrade, digital operation and maintenance, technical consultation, spare parts sales, etc Technical Modification & Upgrade
We designed new operating curves to effectively eliminate yellow plume of 9FA DLN2.0+ during start up and successfully implemented on the unit. The same solution may apply to most gas turbines with high emission at start up.
We have just successfully completed the project of water injection for NOx control on B/E class unit. We designed water injection control curve, combustor fuel nozzle, liner, water injection module and PLC software. The unit emission was reduced from 140ppm to 37ppm with water injection. The plant power has obvious improvement from the modification. Technical Consultation
Helping customers to write combustion chamber design specifications, including material selection, flow field calculation, thermal analysis, size design, etc.
Build a gas turbine health management system, analyze and calculate the collected data, and realize the early warning and diagnosis of gas turbine faults. Spare parts
|